One prompt.
Five top models.
Nothing missed.

PRISM asks five independent open models at once and brings back what each of them saw, including the things only one of them noticed.

How it works

How it works

01

Split

The prompt goes to five models from five different labs, none of them aware of the others.

02

Gather

Every answer comes back whole. Nothing is discarded because it was outnumbered.

03

Show

You see what they agreed on, and you see what only one of them caught.

Five minds. Each good at something different.

Every review goes to all five. Anything one of them raises stays in, even if the other four missed it.

Colosseum
Decisive

Opens on a hard problem and shows its working the whole way down.

Reasoningstrength
1.65Tparameters
MITlicence
Pantheon
Widely read

Reaches for obscure ground without effort and brings back what it finds.

Knowledgestrength
2.45Tparameters
qwen3.8-maxlicence
Vega
Exact

Every finding it raises has already been checked against the text it came from.

Precisionstrength
753Bparameters
MITlicence
Gnomon
Thorough

Holds the same attention on the last page as it did on the first.

Coveragestrength
2.78Tparameters
kimi-k3licence
Folio
Resourceful

Finds the efficient route, then explains it in fewer words than it took to find it.

Structurestrength
427Bparameters
minimax-communitylicence

See it work.

One document. Five models. Watch what each of them comes back with.

migration-plan.md
Colosseum
  • The plan switches all reads/writes to OrderStore before historical orders are copied, so existing orders will be missing; if an old order is updated in OrderStore before backfill reaches it, the later Postgres bulk copy can overwrite the newer value.

  • Phase durations total 9 days (2+1+4+2), which contradicts the stated one-week total; no overlap or adjusted schedule is given.

  • The plan monitors and pages on elevated 5xx but does not define rollback criteria or a path back to Postgres if OrderStore fails.

  • The 4-day critical backfill phase is assigned to TBD, leaving execution responsibility unowned.

  • Row counts between OrderStore and Postgres will not match after cutover because new writes are going to OrderStore; the plan does not explain how to account for those writes or detect overwrites.

Pantheon
  • Phase 2 switches all reads to OrderStore, but Phase 3 (bulk-copy of historical data) hasn't run yet. Any query for an order older than the replication window will return nothing or error.

  • The plan states downtime is not expected and the switch is a config flip, but never describes what to do if OrderStore degrades or returns errors after the switch. There is no stated procedure to revert reads/writes back to Postgres.

  • 2 + 1 + 4 + 2 = 9 days of phased work. Even on a 7-day calendar week this doesn't fit, and no parallelism between phases is described.

  • Phase 1 sets up replication of new Postgres writes into a staging queue, but no phase describes applying those queued writes to OrderStore. Writes landing between replication setup and cutover risk being lost.

  • The backfill is four days of bulk-copy and verification work with owner listed as TBD, making accountability and scheduling coordination unclear for the most time-consuming phase.

Vega
  • Phase 2 switches all reads to OrderStore before Phase 3 copies historical orders, so reads of any pre-migration order will return nothing until the 4-day backfill completes.

  • Phase durations sum to 9 days (2+1+4+2) but the stated total duration is one week (7 days).

  • Phase 1 replicates new writes into a staging queue, but nothing describes how production OrderStore receives those writes so it can serve reads after cutover.

  • Phase 2 monitors error rates and pages on 5xx, but does not define a rollback to Postgres or a failover procedure if the switch is broken.

  • Phase 3 backfill and verification is critical to data integrity but its owner is still TBD.

Gnomon
  • Phase 2 switches all reads to OrderStore, but the backfill doesn't start until Phase 3, so for ~4 days every read of a pre-migration order will miss or fail. This contradicts the stated goals of no data loss and no downtime; backfill (or at least read-fallback to Postgres) must precede or accompany the read cutover.

  • Phase 1 sends new writes to a "staging queue," but no step ever drains or applies that queue into OrderStore, and Phase 4 removes it. Any writes made between replication start and the cutover config flip would be silently dropped unless a queue-drain step is added before or during cutover.

  • Phases total 2+1+4+2 = 9 working days, but the plan states a total duration of one week. Either the phases need to be compressed/parallelized or the stated duration corrected.

  • Phase 2 says to "page on any elevated 5xx" but gives no procedure to revert the config flip, re-point traffic to Postgres, or handle a failed/partial backfill. A one-line rollback path (flip config back, since Postgres is still intact until Phase 4) should be explicit.

  • Phase 3 is the longest and most data-critical phase (bulk copy plus verification) yet is marked "Owner: TBD." It needs a named owner before the migration starts, especially since Phase 4 (dropping the Postgres tables) depends on its verification being done correctly.

Folio
  • Phase 2 switches all reads/writes to OrderStore, but Phase 3 (which populates historical orders) runs afterward, so for up to 4 days the API cannot serve any historical order from OrderStore. Backfill must complete before or concurrently with cutover.

  • Phase 2 flips all order traffic to OrderStore with only a 2-hour error-rate watch and no documented procedure to revert reads/writes to Postgres if OrderStore misbehaves, corrupts data, or falls over after the monitoring window.

  • Phase 3 (the bulk historical copy and reconciliation) is the largest and riskiest phase and is assigned to "TBD", leaving the most failure-prone step unowned.

  • The phases sum to 2 + 1 + 4 + 2 = 9 days, not the stated "one week" (7 days); the schedule is understated and likely unrealistic for a backfill of this size.

  • The plan jumps straight from "replicate new writes into a staging queue" to live traffic on OrderStore with no period of dual-writing or shadow-reading against Postgres to confirm parity, ordering, and correctness of the new store.

Recorded from an actual run.

Credits

To use PRISM models as your personal AI crew:

01

Get $PRISM

Buy the token. That is the only way in, there is no card checkout.

02

Connect your wallet

No email, no password. Your wallet is the account.

03

Ask

How much you hold sets your tier. The models do the rest.

$PRISM contract address

Not deployed yet. The address appears here when it is.

AIRDROP

Every $PRISM holder will be eligible to receive an airdrop featuring NVIDIA (NVDA), one of the companies at the center of the global AI revolution.

The goal is simple: give PRISM holders direct exposure to the company powering the infrastructure behind the next generation of AI.

Incoming

PRISM x GPT-6 Astra

Every panel needs someone to run the room. Astra takes the chair: it holds all five reads, catches where they agree in different words, and writes the verdict without flattening the split. The chair does not get a bigger vote.

Rolling out to API in the coming days. The moment it is reachable, it is in.

Beta is open.

Prism

© 2026 PRISM. All rights reserved.